Instructions on how to prepare the Deliverables and latex templates can be found here.
Deliverable template can be found here.

Del. no. Deliverable title WP no. Lead participant Del. type Security Delivery (proj. month) State Review
D13.1 Project presentation WP13 PSNC WWW Pub. 2 delivered
D1.1 Requirements Document WP1 MPG Spec. Int. 3 delivered
D3.1 Specification of metadata WP3 CARDIFF Spec. Int. 3 delivered
D4.1 Cactus Portal Prototype WP4 MPG Prototype Int. 3 delivered
D5.2 Prototype Testbed WP5 MU Spec. Int. 3 delivered
D6.1 Requirements Document WP6 PSNC Spec. Int. 3 delivered
D7.1 Report on use cases for adaptive components WP7 VU Report Int. 3 delivered
D8.1 Requirement analysis WP8 ZIB Spec. Int. 3 delivered
D9.1 Requirement analysis and definition for the grid resource management system WP9 PSNC Spec. Int. 3 delivered
D10.1 Report on the current GIS capabilities and limitations WP10 ISUFI Report Pub. 3 delivered
D11.1 Requirements analysis report WP11 SZTAKI Spec. Int. 3 delivered X
D13.2 Information Exchange Plans WP13 PSNC Report Int. 3 delivered
D14.1 Quality Assurance Plan WP14 PSNC Report Int. 3 delivered
D14.4-D14.15 Quarterly reports (D14.4, D14.5, D14.6, D14.7, D14.8, D14.9, D14.10, D14.11) WP14 PSNC Report IST 3 D14.4-11 delivered
D5.1 Policy WP5 MU Tesbed Policy Int. 6 delivered X
D5.5 GIS WP5 MU Prototype Int. 6 delivered
D1.2 Technical Specification Document WP1 MPG Spec. Int. 6 delivered
D3.2 Prototype WP3 CARDIFF Prototype Int. 6 delivered
D3.3 Distributed work-flow concept WP3 CARDIFF Report Int. 6 delivered
D4.2 Requirements analysis WP4 MPG Spec. Int. 6 delivered
D6.2 Technical Specification Report WP6 PSNC Spec. Int. 6 delivered
D8.2 Technical specifications WP8 ZIB Spec. Int. 6 delivered
D9.2 Technical specification document WP9 PSNC Spec. Int. 6 delivered
D10.2 Requirements and technical specification WP10 ISUFI Spec. Int. 6 delivered
D11.2 Detailed Architecture Specification WP11 SZTAKI Spec. IST 6 delivered X
D13.3 Dissemination addressees WP13 PSNC Database Int. 6 delivered
D13.4 Dissemination and Use Plan WP13 PSNC Spec. Int. 6 delivered
D14.2 Methodology for quality assurance WP14 PSNC Spec. Int. 6 delivered
D4.3 Administration Portal WP4 MPG Prototype Int. 12 delivered
D6.3 Implementation and Test Plan WP6 PSNC Spec. Int. 12 delivered
D7.2 Report on design of adaptive components WP7 VU Report Int. 12 delivered
D8.3 Data discovery and tracking services WP8 ZIB Prototype Int. 12 delivered
D9.3 Prototype working with Cactus and Triana on a GridLab testbed WP9 PSNC Prototype Int. 12 delivered
D10.3 Prototype release WP10 ISUFI Prototype Int. 12 delivered
D11.3 Grid Monitoring Architecture Prototype WP11 SZTAKI Prototype IST 12 delivered
D12.1 Mobile-enabled information exchange WP12 PSNC Prototype Int. 12 delivered
D13.8 Open Source repository and user support WP13 PSNC WWW Pub. 12 delivered
D14.3 Architecture requirements document WP14 PSNC Spec. Int. 12 delivered
D14.16-D14.18 Yearly reports (D14.16, D14.17) WP14 PSNC Report IST 12, 24, 36 D14.16 delivered, D14.17 under dev.
D11.4 Extended Architecture Specification WP11 SZTAKI Spec. Int. 15 delivered
D13.5 Report of the First Annual Workshop WP13 PSNC Report Pub. 15 delivered
D12.2 Mobile-enabled grid middleware and/or grid gateways WP12 PSNC Prototype Int. 18 delivered
D5.6 Prototype tool WP5 MU Prototype Int. 18 delivered
D8.4 Low level data access services WP8 ZIB Prototype Int. 18 delivered
D1.3 Prototype GAT-API specification WP1 MPG Spec. Int. 18 delivered
D1.4 Prototype GAT implementation and User's Guide NEW! WP1 MPG Prototype Pub. 18 under dev.
D2.1 CGAT functionality and implementation plan NEW! WP2 MPG Prototype Pub. 18 under dev.
D3.4 Triana Release WP3 CARDIFF Prototype Pub. 18 delivered
D3.6 Mobile communication by email WP3 CARDIFF Prototype Int. 18 delivered
D4.4 Finalised Portal Design Document NEW! WP4 MPG Prototype Pub. 18 delivered
D4.5 Prototype of protlet framework NEW! WP4 MPG Prototype Pub. 18 under dev.
D5.8 Prototype portals WP5 MU Prototype Int. 18 delivered
D9.4 Report on the prototype integration with the GAT WP9 PSNC Report Pub. 18 delivered
D5.3 Production testbed NEW! WP5 MU Testbed Int. 21 delivered
D2.2 Prototype implementation of CGAT NEW! WP2 MPG Prototype Pub. 24 under dev.
D3.5 Heterogeneous distributed runs NEW! WP3 CARDIFF Prototype Int. 24 delivered
D4.6 Completed migration of ASC Portal to portlet framework NEW! WP4 MPG Prototype Pub. 24 under dev.
D6.4 Documented first release of the security infrastructure and APIs NEW! WP6 PSNC Prototype Int. 24 delivered
D7.3 Implementation of core adaptation functionality NEW! WP7 VU Prototype Int. 24 delivered
D8.5 High level data access services NEW! WP8 ZIB Prototype Int. 24 delivered
D8.9 First release of DM services NEW! WP8 ZIB Prototype Int. 24 delivered
D9.5 First release of the prediction-based multicriteria grid resource management system (MC-GRMS) NEW! WP9 PSNC Prototype Pub. 24 delivered
D10.4 Extended GIS release NEW! WP10 ISUFI Prototype Pub. 24 delivered
D11.5 Prototype of the Extended Architecture NEW! WP11 SZTAKI Prototype Pub. 24 delivered
D12.3 Small-bandwidth optimized adaptive grid services NEW! WP12 PSNC Prototype Int. 24 delivered
D13.9 Exploitation Plan NEW! WP4 PSNC Prototype Pub. 24 delivered
D13.6 Report on the Second Annual Workshop NEW! WP13 PSNC Report Pub. 26 delivered
D8.6 Data management integration WP8 ZIB Prototype Int. 28 not started
D2.3 Cactus applications grid-enabled through the CGAT WP4 MPG Prototype Int. 30 not started
D8.7 Evaluation of DM services WP8 ZIB Report Int. 30 not started
D10.5 First release report WP10 ISUFI Report Pub. 30 not started
D12.4 Minimal Grid Interface (MGI) WP12 ZIB Prototype Int. 30 not started
D5.7 Production tool (final) WP5 MU Prototype Pub. 30 not started
D5.10 InterGrids WP5 MU Prototype Pub. 32 not started
D8.8 (Parallel) dynamic data filters WP8 ZIB Prototype Int. 32 not started
D7.4 Implementation and integration of components WP7 VU Prototype Int. 33 not started
D2.3 Demonstrations of CGAT with real-world application at SC2004 WP4 MPG Prototype Pub. 35 not started
D1.5 Final GAT-API specification WP4 MPG Prototype Int. 36 not started
D1.6 Canonical GAT implementation and User's Guide WP4 MPG Prototype Int. 36 not started
D4.7 Portlet Developers Guide WP4 MPG Prototype Int. 36 not started
D4.8 Final release of Cactus and Generic Simulation Portals WP4 MPG Prototype Int. 36 not started
D5.9 Production Portals (final) WP5 MU Prototype Pub. 36 not started
D5.4 Final testbed WP5 MU  Testbed Int. 36 not started
D2.3 Revised CGAT (v2.0) WP2 MPG Prototype Pub. 36 not started
D3.7 Triana remote steering WP3 CARDIFF Prototype Pub. 36 not started
D3.8 User manual WP3 CARDIFF Report Pub. 36 not started
D6.5 Documented second release of the security infrastructure and APIs WP6 PSNC Prototype Pub. 36 not started
D7.5 Report on result evaluation WP7 VU Report Pub. 36 not started
D8.10 Final release of DM services WP8 ZIB Release Pub. 36 not started
D9.6 Report on the final release WP9 PSNC Report Pub. 36 not started
D10.6 Second release report WP10 ISUFI Release Pub. 36 not started
D11.6 Prototype of the Adaptive Architecture WP11 SZTAKI Protype Pub. 36 not started
D12.5 Offline-Connectors, synchronization tools WP12 ZIB Prototype Pub. 36 not started
D13.7 Report of the Final Annual Workshop WP13 PSNC Report Pub. 36 not started
D13.9 Best practices and recommendation documents WP13 PSNC Spec./ Reports Pub. 36 not started

This is the completed list of deliverables according to the IST Contract Amendment2. All the deliverables not delivered are denoted as "not started".
All other ones not delivered yet but being developed are marked as "under development". Please, let me know if the update is needed. Zbyszek Krzewinski



GridLab: Grid Application Toolkit and Testbed is co-funded by the European Commission under the Fifth Framework Programme (IST-2001-32133).
Web admin: Petr Holub, web design: Radoslaw Strugalski

Last update on Friday, 28-May-2004 09:53:22 CEST.